Remove Drawings Remove Engineering Remove Fabrication Remove Schedule
article thumbnail

How to Calculate Slab Steel Quantity from Drawing

CivilJungle

For cutting and bending purposes, schedules should be provided as separate A4 sheets and not as part of the detailed reinforcement drawings. • The form of bar and fabric schedule and the shapes of the bar used should be in accordance with BS 8666. • Bar Bending Schedule Required Ment Data. Slab Beam. x d)) +Lap.

article thumbnail

Guidelines for rebar detailing of RCC structures

Construction Cost Estimating

Reinforcement Detailing or Rebar detailing is a detailed construction engineering process normally accomplished by the Rebar fabricators, structural engineering consultants or the contractors for generating ‘shop/placing’ drawings or shop drawings and bar bending schedule of steel reinforcement for construction.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Innovative Approaches to Industrial Construction Project Management

Construction Marketing

This has obviously led to large-scale improvements in the way structures are designed and building materials are fabricated. All stakeholders have access to the same files, documents, drawing, and models. This includes everyone from architects, engineers, contractors, and subcontractors. It streamlines scheduling.

article thumbnail

Download Bar Bending Schedule Of Box Culvert

Construction Cost Estimating

Definition of Bar bending schedule(BBS) Bar bending schedule alias schedule of bars refers to a list of reinforcement bars, a specified RCC work item that is shown in a tabular form for a smooth view. While generating bar schedules, it is important to take proper care about length.

article thumbnail

Considerations and challenges for prefabricated wall panel enclosures

Construction Specifier

Prefabricated wall panels are individually manufactured in an offsite fabrication shop, complete with exterior cladding and fenestration, anchor system, water/air/vapor barrier(s) and flashing, insulation , and the structural framing. With panelized wall systems, all the materials, tools, and large dumpsters are at the fabrication shop.

article thumbnail

What’s the difference between RFIs, Submittals and Specifications?

Fieldwire

In construction, a Request For Information (RFI) seeks the clarification of plans, drawings, specifications, and agreements. During the construction process, the contractor encounters a discrepancy between the architectural plans and the structural drawings.

article thumbnail

SHOP DRAWING creates maximum benefits for construction companies

Construction Cost Estimating

The shop drawing is a drawing or collection of set of drawings, diagrams, illustrations, schedules, and other data or information specifically generated or assembled by the contractor, supplier, manufacturer, subcontractor, or fabricator to demonstrate some portion of the work for the approval of architect or engineer.