Remove Drawings Remove Information Remove Overhead Remove Schedule
article thumbnail

3 Ways to Take Construction Asset Tracking to the Next LevelĀ 

Autodesk Construction Cloud

spreadsheets) aren’t conducive to effective asset tracking because they lack features that enable real-time information sharing and integrations with other systems. And while project schedules are helpful, they’re often static and don’t contain the most updated project info. checklists, schedules, etc.),

article thumbnail

10 Essential Types of Construction Documents

Autodesk Construction Cloud

Having access to these construction documents puts information into the hands of the right people at the right time, so decisions can be made quickly and action can be taken to finish projects on time and within scope. . Architectural drawings. Schedules. Supplier information. A general schedule and timeline.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

8 Main Types of Construction Contracts

Autodesk Construction Cloud

The construction industry uses different kinds of agreements depending on the projectā€™s scope, delivery, schedule, budget, and the parties involved. They also include overhead costs such as insurance, mileage, a portion of your office rent. In other words, the contractor is incentivized for controlling costs and staying on schedule. .

article thumbnail

JOC Tutorial #71 ā€“ Terms

Job Order Contracting

k) ā€œProject scope of workā€ – the document and related drawings, specifications, and writings referenced therein which together set forth the specific requirements and work to be accomplished by the job order contractor in connection with an individual job order. The prices shall not include overhead and profit.

article thumbnail

Army Job Order Contracts FAIL to meet AFARS requirements MOST OF THE TIME

Job Order Contracting

Instead, the Government applies “area cost factors” or “location factors” to attempt to localized the cost information. general and administrative and other overhead costs, insurance costs, bonding and alternative payment protection costs, protective clothing, 5117.9002 Applicability. (a)

Contract 226
article thumbnail

What Is Estimate | Types of Estimate |Requirement Data for Estimation |Advantage of Estimate | Disadvantage of Estimate | Types of Cost Estimation

CivilJungle

Drawings (Plans, Sections, etc.). Drawings : Planning , sectional elevations, and accurate scale drawings are needed, completely dimensioned. Typically the plan, elevation and sectional elevations are drawn to a scale of 1cm = 1m and accurate drawings are planned for scales of 1cm = 10cm to 1cm = 29cm. Specifications.

article thumbnail

Lean Construction ā€“ Overcoming decades of mistrust, lack of communication, and opposition between facilities owners, designers, engineers, and builders.

Job Order Contracting

Project cannot be expedited with a collaborative fast-track process; drawings and specs must be 100% complete to bid (though latter rarely occurs). Bid shopping can occur and actual overhead and profit amounts are unknown. Design changes can result in costly impacts to drawings or construction work in progress. Advantages.

Design 130