article thumbnail

The importance of photo documentation for construction and how to avoid the admin nightmare

Lets Build

Without a doubt, photo documentation is one of the most essential aspects of field reporting and field tracking. This is why it is important that all stakeholders take extremely detailed photos that document every step of their work on site. That being said, photo documentation is one of your biggest assets in this effort.

article thumbnail

9 Best Practice Tips for a Schedule Analysis of Construction Delays

Best Practices Construction Law

When savvy contractors face delays on a project, they immediately take steps to provide notice, document, evaluate and plan for recovery from those delays. However, the different methods of schedule analysis can lead to varying results. If the delay absorbs the “float” in the schedule, then it is not compensable.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

ConsensusDocs Contract Schedule Specifications Moving Towards CPM

Construction Dive

This article started out as a review of a schedule specification clause in a recently updated standard form document. As a reader of ConstructionPro Week, you may have noticed we often advocate for active use of schedules on construction projects. 5 – Issue 48, 12/16/2017). ” Read more.

article thumbnail

8 Best Practice Tips for a Schedule Analysis of Construction Delays

Best Practices Construction Law

When savvy contractors face delays on a project, they immediately take steps to provide notice, document, evaluate and plan for recovery from those delays. However, the different methods of schedule analysis can lead to varying results. If the delay absorbs the “float” in the schedule, then it is not compensable.

article thumbnail

5 tips that every site foreman should know about

Lets Build

That’s the only way to ensure that there will be no obstacles in the development of both your short-term lookaheads and your master schedule. They can’t maintain a seamless real-time connection between the updates from the site and the different schedules (master schedule, short-term schedule, procurement schedule, etc) you are working on.

Site 158
article thumbnail

I Lived It: Litigator Provides His Perspective on Solar Warranty Claims

Constructlaw

This article explores practical steps a solar array owner or operator can take now to better position itself to make warranty-related claims five, 10 or even 25 years into the future. Double check that the documents just described include the warranty itself. Reposted from Solar Power World with permission.

Claims 52
article thumbnail

How to streamline your quality control process and conduct efficient inspections with Fieldwire

Fieldwire

You can use Fieldwire to seamlessly document each quality control item while online or offline. With constantly coordinated activities, all your QC issues can be easily identified, addressed, and verified before the schedule or budget are impacted. Learn more about custom forms in this article.