Remove Documentation Remove Drawings Remove Fabrication Remove Reference
article thumbnail

What Are As Built Drawings?

Autodesk Construction Cloud

If a picture can speak a thousand words, in a project, as-built drawings can speak a thousand construction processes. But in all seriousness, with the hundreds and thousands of steps and documents needed to complete just one project, as-builts might be overlooked for their importance. Shop drawing changes. Key Takeaways.

article thumbnail

Difference Between Sketching and Drawing | What Are Conceptual Sketches | Architecture Concept Drawing | Types of Drawings for Building Design

CivilJungle

Concept drawing can also be used to explore more technical aspects of a design providing an initial response and possible solutions to problems, constraints and opportunities such as service layout, structure, method of construction, paths and shading, patterns and calculations, the relationship between aspects of size etc. Scale Drawing.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

What’s the difference between RFIs, Submittals and Specifications?

Fieldwire

In construction, a Request For Information (RFI) seeks the clarification of plans, drawings, specifications, and agreements. The construction RFI is a formal written process in which parties, such as the contractor and designer, clarify information gaps in construction documents.

article thumbnail

Detail quality control methods in construction works

Construction Cost Estimating

This civil engineering article sheds light on the inspection method of various civil works as well as necessary documents to carry out an inspection at construction project. Construction activities and consequent inspection standard should be based on job site specifications, methods and drawings.

article thumbnail

The future of specifiers: The way forward

Construction Specifier

They see trends toward integrating information better, both with building information modeling (BIM) and drawings, and between teammates. Generally, the big-S-Specifier refers to a person whose specialty, training, and daily work are focused on written specifications. Cam Featherstonhaugh.

CSI 97
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

The following template is provide for sample purposes only and should not be used a legally bidding document without through review and modification by appropriate Owner legal counsel. coefficient (reference table of allowable overhead). Architect/Engineer’s Guidelines, Quality Control, and other related documents in effect at.

Contract 100
article thumbnail

Learn What’s New in Revit 2019 for Structural Engineers and Detailers

BIM & Beam

Having a more accurately defined design model in Revit also enables a better interoperability with Advance steel for steel detailing and fabrication. Documentation with steel details. You can use a set of dedicated tools to create precise and detailed engineering drawings where steel connections are represented accurately.