Remove blog-name point-view
article thumbnail

Top 2023 Security Trends For Construction Site Security

Construction Marketing

With a typical on-premise camera system, your security staff must be inside a security operations room to view the security camera feed on monitors via servers. With cloud-based TVL security cameras , your security staff can access cloud-based control centers and mobile applications that can view security data from anywhere.

Security 282
article thumbnail

BRICK MASONRY CONSTRUCTION TIPS

The Constructor

In the brick work, the bricks should be laid on their beds with the frogs pointing upwards. When the mortar is green, the face joints should be raked to a depth of 12 to 19mm in order to have a proper key for plastering or pointing. The mortar joints should be stuck flush and finished if no plastering or pointing is to be done.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Old Stone Building Still Standing

Natural Building

Paul says the getaway was named for its stunning panoramic view of Fox Point Lake in the distance. The post Old Stone Building Still Standing appeared first on Natural Building Blog. It belonged to his grandfather, who operated a fish plant in Hubbards Cove, Canada.

article thumbnail

Burning Man Design Competition

Natural Building

Indeed from a landscape point of view, parts of Fly Ranch – named after the hot-water-gushing Fly Geyser – already look like wildly beautiful creations. The post Burning Man Design Competition appeared first on Natural Building Blog. You can read the original article at toysmatrix.com.

Design 52
article thumbnail

SURVEYING: ERROR SOURCES IN TOTAL STATION

The Constructor

To test for horizontal collimation error, point to a target in face one then point back to the same target in face two; the difference in horizontal circle readings should be 180 degrees. Horizontal collimation error can always be corrected for by meaning the face one and face two pointings of the instrument. (1)

Concrete 240
article thumbnail

CONNECTIONS FOR PRECAST FLOOR SLABS

The Constructor

First, a rubber bearing is placed at the support point. Reply Leave a Reply Click here to cancel reply Your name (Required) Your e-mail (Your email wont be published) (Required) Your website Notify me of followup comments via e-mail About The Author This blog is authored and maintained by Gopal Mishra.

Concrete 223
article thumbnail

SETTING OUT OF FOUNDATION TRENCHES

The Constructor

The following points should he observed while setting out trenches: (i) Profiles, nails, strings and lime are used for Setting out the foundation plan. (ii) The depth of trenches and other levels should also be regulated by measurements from this point. (vi) Tweet Loading GET LATEST TOPICS IN YOUR EMAIL- SUBSCRIBE NOW.