article thumbnail

Construction Equation: Knowledge Problems + Data Problems + Management Problems = Outcome Problems

Job Order Contracting

Lack of recognition by senior management of the linkage between between the built environment and organizational mission Low level of understanding of both life-cycle total-cost-of-ownership management and integrated lean planning, procurement, and project delivery principles and processes. Data Problems. Heralova, R. Procedia Engineering.

article thumbnail

Integrated Construction Planning, Procurement, and Project Delivery Solution

Job Order Contracting

Achieving and Maintaining Excellence Requires – Collaboration, Team Alignment and Tracking, Accountability, Clarity of Goals, Problem Solving, Fiscal Transparency, Robust Process, Common/Shared Data Environment, Levelling Up Team Knowledge. 12 Restructuration of architectural. Cheng, R., & Johnson, A. Leite, F., & Mulva, S.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Sight Survey 2016 – A Completely 3d Coordinate Geometry Package For Surveyors

Construction Cost Estimating

Carlson Software recently launched Sight Survey 2016 , a completely 3d coordinate geometry package that includes a wide range of toolset to bring solutions to your regular COGO calculations. Sight Survey 2016 contains supplementary tools which can work with Carlson’s 3D design environment software in Precision 3D – Culverts (sold distinctly).

CAD 40
article thumbnail

UK BIM has same issue as US BIM

Job Order Contracting

The UK BIM Level 2 requirement went into effect 4th April 2016 and little has changed. While the UK has come up with nice name like the “BIM/Soft Landings” initiative, the design/construction/operational process has not improved. The post UK BIM has same issue as US BIM appeared first on 4BT.

BIM 100
article thumbnail

Tocci Building Companies: A serious contender in the 2016 Best Construction Blog competition

Construction Marketing Ideas

This Tocci Building Companies blog posting describes trends in laboratory design research — and is an example of the blog’s comprehensiveness. Will this well-designed and content rich blog win again in 2016? Will this well-designed and content rich blog win again in 2016? They are volunteers.).

article thumbnail

AIA Colorado West Presents 2016 Design Awards

ENR Construction

Western Colorado architects recognized for excellence in designing the built environment.

article thumbnail

Overcoming Stigma, Buyers Are Turning To Prefab Homes

Pro Builder

Unlike a traditionally built house, a manufactured home is assembled in a facility with a controlled environment and later delivered to its final location. For the first time in 15 years, manufactured homes were on track to deliver more than 100,000 units last year, a 23% increase over 2016, according to the organization.