Remove Consulting Remove Documentation Remove IDEA Remove Schedule
article thumbnail

Project Foundation Pt. 1: Building the Master Schedule

Stok

That foundation is a detailed schedule and budget, created and owned by the Project Manager, with input from consultants and contractors, and approved by the Client. To start, here are key considerations to take when creating the Master Schedule, prioritized by stok’s Project Managers : 1.

article thumbnail

Show Village 2021: 3 Idea Homes for the Way We Live Now

Pro Builder

Show Village 2021: 3 Idea Homes for the Way We Live Now. A New Era of Idea Homes at IBSx. She opens the two awning windows along one side of the space, logs onto her computer, and starts opening the documents she needs to underwrite a mortgage loan application. cbroderick. Thu, 02/04/2021 - 00:00. Michele Lerner. and the Future.

IDEA 98
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

DebunkTheBIM: Model validation through scheduling

DebunkTheBIM

Model validation through scheduling. Even if you never get into providing quantities for QS purposes from your model, GET familiar with the scheduling capabilities of your modeller (as in software-application). The idea is to use labels (metadata) within elements to reflect the stage they are at. ► April. (8).

article thumbnail

Dos and Don’ts for your Job Order Contracting Consultant RFP

Building Information Management

Dos and Don’ts for your Job Order Contracting Consultant RFP. I’ve had lots of inquiries about my last blog post , and lots of owners have asked specifically what provisions they should avoid to ensure healthy competition on their JOC Consultant RFPs. How to determine JOC consulting and implementation contract provisions.

article thumbnail

The Utah Preconstruction Lien Process Explained

Levelset

Long) story short: A preconstruction lien is available to architects, engineers, surveyors, estimators, schedulers, and the like. It’s a good idea to contact the recorder’s office ahead of time to confirm that you meet all the specific requirements. Related: Read the guide to notarizing common construction documents.

Lien 52
article thumbnail

Why Projects Fail

Job Order Contracting

Organizations that do not implement and continuously import upon a program-based approach, under which all projects a planned, procured, and executed, suffer from unclear objectives , shifting requirements , unrealistic schedule s, and reactive planning , Poor planning and poor change management impede individual project successes.

article thumbnail

Top 30 Construction Classes at Autodesk University 2021

Autodesk Construction Cloud

We recommend registering for AU 2021 to receive this year’s official schedule as soon as it’s released. You’ll hear from Lauren Collier at the SSOE Group as she shares: How collecting and using data through the lifecycle of a project can help teams stay on schedule and maintain costs. Jump to classes by process/topic.