Remove Design Remove Drawings Remove Fabrication Remove Reference
article thumbnail

Difference Between Sketching and Drawing | What Are Conceptual Sketches | Architecture Concept Drawing | Types of Drawings for Building Design

CivilJungle

Concept designs can be simply a series of sketches, ideas and explorations. it can also go into considerable depth, including design illustrations, indicative plans, sections and elevations and 3D Models of a development approach. ”. Architecture Concept Drawing. Types of Drawings for Building Design. Perspective.

article thumbnail

What Are As Built Drawings?

Autodesk Construction Cloud

If a picture can speak a thousand words, in a project, as-built drawings can speak a thousand construction processes. Nonetheless, as-built drawings remain an essential process in a project, especially to maintain a project’s lifecycle after construction has ended. . Shop drawing changes. Design changes. Key Takeaways.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

How to Calculate Slab Steel Quantity from Drawing

CivilJungle

. • For cutting and bending purposes, schedules should be provided as separate A4 sheets and not as part of the detailed reinforcement drawings. • The form of bar and fabric schedule and the shapes of the bar used should be in accordance with BS 8666. • How to Calculate Slab Steel Quantity from Drawing Excel Sheet.

article thumbnail

What’s the difference between RFIs, Submittals and Specifications?

Fieldwire

In construction, a Request For Information (RFI) seeks the clarification of plans, drawings, specifications, and agreements. The construction RFI is a formal written process in which parties, such as the contractor and designer, clarify information gaps in construction documents. What is a specification?

article thumbnail

The 8 wastes of lean construction

Fieldwire

This includes material being stored on-site or at the fabrication yard, work in progress, and unused tools or parts. This includes time spent looking for a tool or file, as well as walking extra yards due to a poorly designed work area. 2) Inventory In construction, inventory waste occurs when overproduction results in excess material.

article thumbnail

Reaching a new level of sophistication with panelized construction

Construction Specifier

With panelized construction, the structural elements are assembled in (typically) two-dimensional wall, floor, or roof components, referred to as panels, which may or may not be finished. The decision to go with panelization must start early in the design process. Then they are shipped and erected.

article thumbnail

The future of specifiers: The way forward

Construction Specifier

Cam Featherstonhaugh, AIA, CDT, associate, truexcullins Architecture + Interior Design; and Michael Chambers, FAIA, FCSI, CCS, associate vice-president, HGA Architects & Engineers were on the panel that was chaired by Mark Dorsey, CAE, FASAE, CEO of CSI. Software and the design process. Michael Chambers. Mark Dorsey.