Remove Consulting Remove Deals Remove Design Remove Documentation
article thumbnail

Behind the Build: Interview with Mostafa Saber, BIM & Design Manager at Diamond Developers

Autodesk Construction Cloud

We sat down with Mostafa Saber , BIM & Design Manager at Diamond Developers as he walked us through his career journey, the challenges he faces while modernising and his vision for the future of construction. Within five years, I exclusively used Autodesk’s Revit to deliver all my architectural designs.

BIM 119
article thumbnail

Construction project management 101 – Checklist

Lets Build

Managing a construction project is a complicated role dealing with complex tasks that get modified from project to project. Following initiation, the project team creates a roadmap — the project management plan (PMP) , a formal document that outlines the project’s execution and control. The process. master plan, education brief)?

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

I challenge building owners to challenge their consultants

DebunkTheBIM

A soft, non-threatening challenge, can be done on any scale of building; Point: For owners to get an appreciation of how well their consultants know the buildings they are in charge of. Try it: Book a time with your main consultant, the main person in charge.* Most importantly, observe your consultant.

article thumbnail

Develop a Commercial site with BRIKS Design-Build Group

BRIKS Design-Build Group

Develop a Commercial site with BRIKS Design-Build Group. Nowadays building commercial sites can be a tough and complicated process as it includes a lot of federal permissions and zonal documents. Apart from dealing with the government there are certain personal interests that you have to consider.

article thumbnail

Renovating A Heritage Building

cnstrctr

These types of buildings are designated as “heritage” and protected under city by-laws. Impacts to the Designer or Engineer. A starting point for any designer is to read the heritage conservation report that was prepared for the building. Conceptual Design Phase.

article thumbnail

Moving from Design-Build, DB, to Integrated Project Delivery, IPD

Building Information Management

Providing the opportunity for the kind of collaboration that the construction industry so badly needs… Design-Build has a spectrum, ranging from almost as dysfunctional … all the way to almost as collaborative as Integrated Project Delivery. Shifting Design-Build toward IPD. Owners, this is bad for you.

Design 69
article thumbnail

OSHA Alert: How to Prepare for an OSHA Inspection

FDR Safety

This can be accomplished by asking the OSHA inspector to wait for the arrival of the designated representative before starting the inspection. Where the inspector refuses to wait or where it is impossible for the representative to personally appear, designate a back-up to fill in.

OSHA 156